Expansion of World’s Largest Sorting and Distribution Facility

Manufacturing Client

Highlights
  • Three floors
  • Multiple conveying systems
  • Inclusion of provisions for future systems
  • Multiple levels of access
  • 3D model incorporating multiple engineering sources' input

South USA

9 million SF

SSOE’s extensive 3D model coordinated the efforts of multiple engineering sources and prevented potential interferences prior to construction, creating savings of $100,000. In addition, a design recommendation increasing the cumulative live load deflection criteria saved $300,000 for a total of $400,000 in savings on design and steel.

SSOE’s extensive structural engineering capabilities were a crucial factor for the success of the upgrade and expansion of the largest sorting and distribution facility and parcel conveyor process in the world. Several of SSOE’s engineers and designers who were part of the original facility’s design were also part of the expansion, bringing extensive knowledge and experience to this project. Included in the scope was the design of primary and secondary steel support, and tertiary steel (grating, handrails, ladders, stairs, catwalks, platforms, etc.) associated with the installation of parcel conveyors. Creating a 3D model for the project, SSOE coordinated information from other engineering sources involved in the various design aspects of the distribution center. The model allowed for automated detection and graphic depictions of potential interferences prior to construction, and proved to be key in resolving critical design decisions for the conveyor installation.

SSOE was faced with many design challenges, including extremely stringent deflection criteria to ensure the proper functioning of highly sensitive sorting equipment. The conveyor layout was very complex with multiple conveying systems, including provisions for future systems, multiple levels of access, and adjacent conveyors that sloped in opposite directions. With this in mind, SSOE recommended a design solution to increase the cumulative live load deflection criteria, which provided more than $300,000 savings for the overall steel costs, all while maintaining the project schedule.

Related Projects

Tire Manufacturing Plant
Tire Manufacturing Plant
Continental Tire the Americas, LLC
Program Management
Program Management
Ceramic Proppant Client