Highlights

  • Design / build
  • 50 million gallons per year expansion
  • Liquifaction, drying, fermentation, evaporation, and distillation
  • Increased cooling tower capacity
  • Increased tank farm capacity
  • Additional fire protection capacity
100 million gallons of production
Watertown, South Dakota

Reduced engineering schedule by 30%, saving GLE $60,000 a day.

Glacial Lakes Energy (GLE), a manufacturer of corn-based ethanol, underwent a capacity increase to more than double their existing capability. SSOE provided full engineering, design, procurement, fabrication, erection, and commissioning support. We coordinated with GLE, the contractor, and the process provider to successfully complete a fast-track, turnkey project which increased GLE’s existing ethanol production to 100 million gallons per year.

SSOE utilized staff in its Shanghai, China office to provide 24-hour project support, which reduced the engineering schedule by 30% and helped bring the facility to full production capacity in just 11 months. Also, as a result of the accelerated schedule, the client recognized a sizable profit. GLE saved $60,000 per day, which equaled approximately $1.8 million in profit per month.