David T. Howard Middle School
Atlanta Public Schools
Design Awards:
Atlanta Urban Design Commission | Award of Excellence in Historic Preservation | 2021
Atlanta Business Chronicle | Top Revitalization / Renovation Deal of the Year Award | 2021
AIA Georgia | Honor Design Award in Renovation / Restoration and Adaptive Reuse Over $1M | 2021
The Georgia Trust for Historic Preservation | Marguerite Williams Award | 2021
SSOE completed the redesign and historic rehabilitation of the empty David T. Howard School, once attended by notable African American luminaries such as Dr. Martin Luther King Jr., into a modern middle school in the heart of Atlanta’s Old Fourth Ward neighborhood.
The $52 million project, which began in early 2017, includes an administrative wing based on an originally designed element that was never built, a four-level classroom addition, media center, auditorium, music wing, and kitchen and cafeteria.
The design team’s approach focused on the existing plan diagram to ensure the building’s historic features were maintained. The new addition connects to the existing building with elements that keep the existing building’s brick visible and joins all the building’s components.
The school is a four-story concrete frame building with brick cladding. The floor plan is a simple “U” shape with corridors connecting the classroom wings. The main entrances along the bottom of the “U” are also identified by decorative brick and stone details. The existing classroom building reflects the original layout as much as possible, and the new classroom wing consists of core, science, and music classrooms; the kitchen and cafeteria; and an auditorium.
SSOE designed a Variable Refrigerant Flow (VRF) HVAC system with 100% outdoor air for the classroom portions of the building, including the historic building. The VRF system allowed the design team to minimize ductwork in the classrooms and maintain the existing high ceilings in the historic classrooms and corridors. Because the VRF outdoor units weigh less than conventional systems, the design team was able to minimize structural modifications to the historic building, saving cost and time. The areas served by VRF are paired with packaged roof top dedicated outdoor air systems (DOAS) with energy recovery. The new DOAS and VRF HVAC systems designed for the project will save energy over the years to come and contribute to an optimal indoor environmental quality for the students and staff and give each space served the ability to control space environmental conditions.
Have a question regarding our services? Need assistance with an upcoming project? Send us an email. We look forward to hearing from you and will follow up soon.
© SSOE GROUP 1948-2025
Legal | Privacy Policy | CA Privacy Policy
Website designed and developed by
Raincastle Communications, Inc.
SSOE is currently piloting software that puts a copilot engine in Revit. Using Natural Language Processing (NLP) we can prompt Revit activities such as cleaning up parameter data, annotation, dimensions, sheets and then can share and deploy automations to co-workers in different workspaces within a project. Transforms traditional process of scripts >> write the code, execute command upon an SME directing. (see transcript)…
We helped our client visualize and optimize façade design for occupant comfort—long before breaking ground through the use of the Autodesk Forma tool. It allows the designer to rapidly experiment with the building’s geometry and façade design to discover the most suitable form, prioritizing quality of spaces and comfort for end uses, especially in extreme climates (daylighting and …
SSOE is utilizing Microsoft Copilot to significantly enhance work efficiency and accuracy across various departments. Copilot is accessible to all staff after training. Key areas of application include using it as a writing assistant, for idea generation, document summarization and generation, research assistant, excel assistant, programming code assistant, language translations, product comparison and data analysis. Use of Copilot has…
We found ourselves in need of a more robust tool to enhance resource forecasting and staff assignment capabilities. Instead of waiting for the perfect tool, we’re building it. SSOE’s in-house technology team has developed and piloted a tool that aims to forecast optimal staff mix and duration for new projects against existing workload to better understand capacity and manage…