Central High School Renovations & Additions

Maury County Public Schools

Highlights
  • High school renovation and addition
  • Construction on existing site
  • Construction on occupied site
  • Energy efficient design
  • Student Centered Learning Environments
  • Participation of schedule development and review on large complex projects
  • Community engagement
  • Educational visioning

Columbia, Tennessee

Approximately 244,000 SF

The project consisted of phased demolition, renovation, and construction of a new 1600 student comprehensive high school complex to accommodate grades nine through twelve at the existing Columbia Central High School site location. Core elements are designed for an enrollment of 1800 students to allow for future expansion.

Being the only operational high school serving Columbia, TN, the Central High School project posed a unique challenge. The school needed to be replaced in place, while students remained in session during the entirety of construction activity. The existing main school buildings were demolished with the exception of the existing ROTC building / auxiliary gymnasium, the classroom building (1997 metal building), and the vocational building. The portable storage and classroom buildings were removed and the existing vocational building was renovated to accommodate the modified career-technical program (26,500 SF).

New construction consisted of a two-story building of approximately 147,265 SF for academic core and shared career-technical program. Auxiliary spaces, which include auditorium, cafeteria / kitchen, music program, and gymnasiums, were connected to the main academic building via corridor extension. The auxiliary portion of the new school complex is single level, totaling approximately 96,746 SF. Site design included separate drop-off areas for school buses and cars, walkways, pedestrian courtyards, landscaping, and off-street parking.

Design intent was to reference the original 1939 Central High School (traditional aesthetic). The main two-story academic building at the front of the site reflects this style through proportion and material selection. As you move around the building, technology and modern design become apparent, representing the future (use of metal panel and modern rectilinear profiles). The proposed design incorporated passive security measures through controlled entry / egress, controlled public access, limiting travel distances and visual observation.

Related Projects

Maplewood Elementary School
Maplewood Elementary School
Sylvania Schools
Stratford STEM High School Renovation
Stratford STEM High School Renovation
Metropolitan Government of Nashville and Davidson County Public Schools
New Elementary Schools
New Elementary Schools
Fremont City Schools