Greenfield Advanced Manufacturing Facility

GEDIA Automotive Group

Highlights
  • Grading package
  • Master planning and comprehensive bridging documents
  • Assisting with design / build contractor selection
  • Construction administration
  • On-site owner's representative services
  • Construction documents

Dalton, Georgia

185,000 SF

SSOE was selected to provide planning, design, and owner representative services to GEDIA Automotive Group for their new advanced manufacturing facility in Dalton, Georgia, with operations expected to begin in the third quarter of 2021.

In the Dalton plant, GEDIA will produce lightweight body-in-white automotive parts and assemblies, as well as chassis components using state-of-the-art press hardening, tempering, and automated welding processes, to produce parts for electric vehicles. The German company manufactures parts for Volkswagen, BMW, and Mercedes vehicles and currently has one operating U.S. plant in Michigan.

GEDIA selected design / build as the project delivery method for this 185,000 SF greenfield facility. SSOE’s scope includes providing an early grading package, master plan and comprehensive bridging documents, assistance to GEDIA in the design / build contractor selection, construction administration, and on-site owner’s representative services. SSOE disciplines involved in the project include project management, architectural, civil, electrical, fire protection, mechanical, and structural.

The construction timing was essential to the process equipment installation. Per an agreement between GEDIA and the general contractor, SSOE was selected to develop the final construction documents for the entire manufacturing facility project.

With GEDIA, SSOE is supporting yet another European-based client expansion in North America, specifically to the ever-growing Southeast region where SSOE has a local presence and expert resources.

Related Projects